Outcomes (sample figures)
24 h
spares dispatch
4,800
pallet spaces
10 wk
to go-live
The challenge
Racking, conveyors and kitting stations for a machine builder’s spare-parts operation. This case study is sample content; replace it with a real project you have permission to publish.
What we did
Summarise the scope, the constraints you worked within and how the work was phased. Use numbers you can stand behind.
Result
Describe the measurable outcome and what the customer can now do that they could not before.
Project data
Scope
Racking, conveyor, WMS
Pallets
4,800
Go-live
10 weeks
Planning something similar?
PRJ
More
More projects.

PRJ-01
Automotive & Mobility
Line A capacity expansion
A second conveyor line and robotic weld cell lifted output for a tier-1 bracket programme without extending the building.

PRJ-02
Food & Beverage
Cold-chain distribution hub
A chilled cross-dock with six insulated doors, built to serve regional grocery routes overnight.

PRJ-03
Industrial Machinery
Press shop retrofit
Rebuilt a 400-tonne hydraulic press with new guarding, controls and quick-change tooling.
